  1. The question that actually matters
  2. Weight versus volume
  3. The red-clay factor
  4. New builds versus older homes
  5. Size by size, honestly
  6. Project-by-project recommendations
  7. What the site will allow
  8. Getting the answer in one call

Almost everybody gets the volume roughly right when they estimate a container. What they get wrong is assuming volume is the constraint at all.

The question that actually matters

When somebody rings and asks for a 20 yard, the useful reply is not "certainly, when would you like it." It is "what is going in it?" That answer changes the recommendation more than any estimate of cubic yardage.

Every roll-off has two limits: the space inside it, and a tonnage allowance set by what the truck can legally carry and what the landfill charges by weight. You reach whichever comes first, and on a lot of jobs around here the second arrives long before the first.

Weight versus volume

Materials vary enormously in density. A cubic yard of loose household clutter might weigh a couple of hundred pounds. A cubic yard of broken concrete or wet red clay weighs closer to two tons.

Roughly from lightest to heaviest per cubic yard: packaging and insulation, furniture and household contents, framing timber, drywall, decking, carpet, asphalt shingles, tile and mortar, brick and block, concrete, stone, and wet red clay.

If your project sits in the top half of that list, order by volume and you will be fine. If it sits in the bottom half, order by volume and you will be paying overweight charges on a container that looks two-thirds empty.

The red-clay factor

This is the local wrinkle worth its own section. Paulding sits in the Georgia Piedmont, and the soil here is the dense red clay that everyone who has dug a footing or graded a lot knows well. It is heavy - and when wet it is very heavy.

Any job that moves earth - footings, foundations, grading, drainage, landscaping - produces clay spoil that will dominate a disposal bill by weight. It belongs in its own dedicated 10 yard container, never mixed into general debris, and it wants to be as dry as the schedule allows, because wet clay is dramatically heavier than dry.

Underestimating clay weight is probably the single most common sizing mistake we see on local excavation and grading jobs.

New builds versus older homes

Paulding is a fast-growing county, so a lot of the work is new construction and remodeling of newer homes. That housing produces bulky, light debris - drywall over stud, engineered flooring, MDF cabinetry, packaging. You fill the box before you trouble the scale, so the larger container is usually right.

Older homes - around downtown Dallas, in the established parts of Hiram and the county's rural areas - give up denser material: heavier framing, plaster in the oldest, layered flooring, sometimes masonry. That wants a smaller container filled properly.

Same square footage, opposite recommendation, depending on the age of the house. That is why the questions matter more than a volume estimate.

Size by size, honestly

10 yard. Twelve feet, one to two tons. The heavy-material container. Concrete, brick, stone, tile and the red clay go here regardless of quantity. Also the one that fits tight driveways.

15 yard. Fourteen feet, two to three tons. The one we recommend most often for dense demolition and renovation debris.

20 yard. Twenty-two feet, three to four tons. Most requested, right about half the time. Kitchen and bathroom together, a multi-layer roof, a large clearance.

30 yard. Six-foot walls, four to five tons. A volume container. Whole-house clearances, new construction framing, newer-home remodels.

40 yard. Eight-foot walls, five to six tons. Commercial work almost exclusively.

Project-by-project recommendations

Single bathroom remodel: 10 yard.

Kitchen alone: 15 yard in an older home, 20 in a newer one.

Kitchen and bathroom together: 20 yard.

Whole-house flooring: 20 yard, and tell us carpet or tile.

Asphalt roof tear-off: depends on squares and layers. Single layer, 15 yard. Multiple layers, 20 and expect it to look half empty when full.

Fully furnished family home clearance: 30 yard.

New construction or major addition: 30 yard, plus a 10 yard for the clay fill.

Patio, driveway, footing or grading spoil: 10 yard, level, probably more than one.

What the site will allow

Sometimes the material says one thing and the site says another.

A 30 yard needs around seventy feet of straight approach. A 10 yard needs about forty-five. On a short driveway or a tight lot around downtown Dallas, the larger container physically cannot be placed however much material you have.

Overhead clearance is the constraint people forget. The truck bed rises well above roof height when it tips - roughly twenty-three feet of clear air is needed. On the older tree-shaded lots and the county's wooded properties, mature limbs stop more deliveries than narrow driveways do.

The fix is simple. Stand in the street, photograph the intended spot with the sky in frame, and send it when you call.

Getting the answer in one call

Have four things ready and this takes ninety seconds: what the project is, roughly when the house was built, what the main material will be, and a photo of the spot from the street.

You will get a size recommendation and a flat rate covering delivery, seven days, collection, disposal at the in-county rate, and a tonnage allowance. If we think you have asked for the wrong container we will say so, including when that means selling you something cheaper.

Book a container in Dallas

One flat rate covering delivery, seven days, pickup and disposal.

(678) 729-9241
Questions & Answers

Questions readers ask about this

What is the most common dumpster size in Dallas, GA?

The 20 yard is requested most often. The 15 yard is what we actually recommend most often for dense demolition debris, since it reaches a weight limit before it fills the container, making it cheaper for heavy material.

What size do I need for a new-construction job?

Usually a 30 yard for the bulky framing and drywall waste, plus a separate 10 yard for the heavy red-clay fill from footings and grading. Keeping the clay separate keeps the whole job cheaper.

Why does red clay need its own container?

Because it is dense and heavy, especially wet, so it hits the truck's legal weight limit while the box looks half full. Mixed into general debris it raises the disposal cost of the whole load. Keep it separate and as dry as you can.

What happens if I go over the weight allowance?

You pay the per-ton overage rate quoted at the start and get a copy of the scale ticket. The arithmetic is straightforward and verifiable, so there are no surprises.